100,000 L of wastewater pumped & processed
A complex liquid residual stream collected on location, transported and processed with full documentation.
The challenge
A client in The Hague had a large quantity of contaminated wastewater that needed to be removed at short notice. The site was hard to reach and the composition of the liquid required careful assessment before transport and processing.
Our approach
We first analysed the waste stream and determined the right processing route. The full 100,000 litres were then pumped on site with the required pumping installation, removed with ADR-authorised transport and processed at a certified facility. All chain documentation was recorded correctly from the outset.
The result
The client was fully unburdened: a single point of contact, smooth execution and watertight administration. The project was completed within the desired timeframe and in line with all laws and regulations.
processed
point of contact
documented